49. If a volatile organic compound leak is detected with respect to an equipment part, the operator must have the required repair carried out within 15 days in the case of fluid or gas consisting of 10% or more in volume of benzene or butadiene or within 45 days in any other case. However, if the repair requires the interruption of an on-going process, the repair must be carried out not later than the next shutdown of the process involved.